Structure :
Load bearing structure with brick Masonry
Wall Finish :
Internal cement finish single coat smooth Finished plaster painted with water base & external double Coat gutka plaster with plastic paint.
Flooring :
Granamite floor finish in Drawing, Dinning, Kitchen and Ottas. Porcelain floor tiles in all bedrooms and other room
Staircase :
Intenal & External steps are finished with natural marble stone.
Kitchen :
Sandwich platform with granite top, S.S. sink and Dedo up to lintel level on the kitchen platform
Bath W/C :
Sandwich platform with granite top, S.S. sink and Dedo up to lintel level on the kitchen platform
Plumbing :
With C.P. fitting of good quality with P.V.C. or G.l pipes
Electrification :
Good quality of accessories and copper woring, with minimum 3.5 points in each room including one point of T.V. Freeze, Mixer and Telephone.
Doors & Windows :
Doors and windows frame from good quality of salwood with flushed door shutters and windows shutters with fully glass and Painted with oil paint and decorative main door.
Soak pit :
Separate soak pit each bunglows


  • Pucca Paved internal and approach road.
  • The Entire premises will be protected with compound wall and with wire fence above it.
  • Aesthetically elegant and attractikve entry gate.
  • Each Bunglows with separate compound wall and gate.
  • For adequate water supply, provided by Nagarpalika.
  • All open plots woll have perfectly marked boundries.


  • Developers rights are reserved for future expansion in adjoining survey number from "Tirupati Royal Residency" scheme.
  • The Developers reserve all rights for any change in plans, specifications or in the whole scheme and such changes shall be final and abide by all members.
  • All legal charges (stamp, Registration charges, what so ever) shall be born ny men\mber.
  • No external changes are permissible, only internal changes may be with prior permission and member will have to bear the cost.
  • This brochure is indicative and can not be considered as the legal document.
  • The member can look at such legal documents at the registered office of the developers.
  • G.E.B line and street light provision by developers and house connection charges born by the members. If government charges/removes any rules and regulation it is bounded to all members.